Estimation and Costing MCQ Questions with Answers | Civil Engineering MCQs ā€“ Part 4

47. The expected outturn of cement concrete 1 : 2: 4 per mason per day is

  1. 1.5 m 3
  2. 2.5 m3
  3. 3.5 m3
  4. 5.0 m3

Answer: D

48. The value of ā€˜Cā€™ of Indian type W.C. shown in the given figure is:

  1. 400 mm
  2. 450 mm
  3. 500 mm
  4. 550 mmĀ 

Answer: C

49. The area is measured correctly to the nearest

  1. 0.01 sqm
  2. 0.02 sqm
  3. 0.03 sqm
  4. 0.04 sqmĀ 

Answer: A

50. The measurement is not made in square meters in the case of

  1. D.P.C. (Damp proof course)
  2. Formworks
  3. Concrete Jeffries
  4. R.C. Chhajja

Answer: D

Also Read ā€“ 100+ Surveying MCQ Questions | Civil Engineering Interview Questions

51. The value of ā€˜Aā€™ of Indian type W.C. shown in the given figure is:

  1. 25 cm
  2. 30 cm
  3. 40 cm
  4. 45 cmĀ 

Answer: B

52. The trap which is provided to disconnect the house drain from the street sewer is called

  1. Master trap
  2. Intercepting trap
  3. Interception manhole
  4. All the above

Answer: D

53. Due to a change in price level, a revised estimate is prepared if the sanctioned estimate exceeds

  1. 2.0 %
  2. 2.5 %
  3. 4.0 %
  4. 5.0 %Ā 

Answer: D

54. The cost of the earthwork in excavation for the surface drain of the cross-section shown in the given figure for a total length of 5 meters @ Rs. 450% cum, is

  1. Rs. 400
  2. Rs. 425
  3. Rs. 450
  4. Rs. 500Ā 

Answer: C

55. The expected outturn of 2.5 cm cement concrete floor per mansion per day

  1. 2.5 sqm
  2. 5.0 sqm
  3. 7.5 sqm
  4. 10 sqm

Answer: C

56. Pick up the correct statement from the following:

  1. The bent-up bars at a support resist the negative bending momentĀ 
  2. The bent-up bars at a support resist the sharing forceĀ 
  3. The bending of bars near supports is generally at 45Ā°
  4. All the above

Answer: D

57. While preparing a detailed estimate

  1. Dimension should be measured correct to 0.01 m
  2. Area should be measured correct to 0.01 sqm
  3. Volume should be measured correct to 0.01 cum
  4. All the above

Answer: D

58. The item of the brick structure measured in sq.m, is

  1. Reinforced brickwork
  2. Broken glass coping
  3. Brick edging
  4. Brickwork in arches

Answer: B

59. The most reliable estimate is

  1. Detailed estimate
  2. Preliminary estimate
  3. Plinth area estimate
  4. Cube rate estimate

Answer: A

60. The reduced levels of points, 30 meters apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of road 120 in 1, the chainage of the point with no filling or cutting is

  1. (6 + 15) chains
  2. (6 + 12) chains
  3. (6 + 18) chains
  4. None of theseĀ 

Answer: B

61. According to ISI method of measurement, the order of the sequence is

  1. Length, breadth, height
  2. Breadth, length, height
  3. Height, length, breadth
  4. None of these

Answer: A